Installation and commissioning support

We coordinate site readiness, installation sequencing, and commissioning gates to accelerate productive startup. Complex multi-axis machines, EDM systems from Sodick, coating systems from PLATIT, and rotary transfer platforms from Precitrame all require structured installation management.

01

Site readiness assessment

02

Installation sequencing and coordination

03

Commissioning verification and handover

01

Service overview

Installation planning begins weeks before equipment arrives. We structure the process around pre-arrival requirements, team responsibilities, and dependency mapping between site and supplier actions. Foundation specifications, power supply requirements, compressed air systems, coolant infrastructure, and ambient temperature control must all be verified against manufacturer installation manuals. A Sodick wire-cut EDM system requires specific water quality and temperature-controlled deionized water supply. A PLATIT PVD coating system needs dedicated gas supply lines and clean-room conditions at the loading zone. A Hermle 5-axis machining center requires foundation isolation meeting specific vibration dampening specifications.

Commissioning checkpoints are documented with acceptance evidence so technical teams can close startup stages in a controlled sequence. We coordinate manufacturer service engineer schedules, ensure that required tooling and workholding are available for test cuts, and manage the handover documentation package including operation manuals, maintenance schedules, electrical schematics, and spare-part catalogs. For multi-machine installations, we sequence commissioning to minimize total production downtime and ensure that upstream and downstream process dependencies are respected.

The result is faster ramp-up and clearer accountability throughout the launch period. Machines commissioned with structured oversight reach productive operation 30-50 percent faster than those installed through informal coordination between buyer and manufacturer service teams.

Key capabilities

  • 01Site readiness assessment
  • 02Installation sequencing and coordination
  • 03Commissioning verification and handover

Need this service?

Describe your requirements and receive a tailored proposal with clear next steps.

Request a quote
02

Our approach

A structured procurement process designed for efficiency and transparency at every stage.

01

Site readiness assessment

Foundation, power supply, compressed air, coolant infrastructure, and ambient conditions are verified against manufacturer specifications.

02

Installation sequencing and coordination

Manufacturer service engineer schedules, tooling availability, and dependency mapping are managed for controlled equipment setup.

03

Commissioning verification and handover

Startup stages are documented with acceptance evidence, and a complete handover package is delivered to operations teams.